Research and development tax credits for construction and engineering firms

Short answer: for construction related businesses, claims usually come from the design phase, not the build phase. Structural, mechanical, electrical, and civil design work on complex projects can involve qualifying experimentation. Building to a finished design, even on a difficult site, usually does not count by itself.

Design work that tends to qualify

Designing structural systems for unusual loads or sites, mechanical and electrical design for hospitals, laboratories, and other complex buildings, civil design involving drainage or grading problems without an obvious answer, and value engineering that evaluates several real alternatives can all involve qualifying activity. The pattern is the same as in other industries: technical uncertainty at the start, alternatives evaluated, and a design chosen through testing or analysis.

Design responsibility is the dividing line

A design build firm that employs or contracts the designers stands in a different position from a contractor building plans drawn by someone else. If your firm does not carry design responsibility for a project, there is usually little for a claim to attach to on that project. Many firms have a mix, which is why a study reviews projects one at a time.

Read the contract before assuming anything

Work funded by a customer can fall outside the credit depending on the contract terms, in particular who keeps the rights in the design and who bears the risk if the work fails. Two similar projects can come out differently because the contracts were written differently. A proper study reads the relevant contract language rather than guessing from the project type.

Records that support a design phase claim

Drawing sets and revision history, engineering calculations, design meeting notes, requests for information that raised technical problems, and the time records of engineers, designers, and project staff doing design work all support a claim. Permit and code review correspondence can also help show where a design problem had to be solved.

Does field construction work count?

Usually only in narrow ways. Solving an unexpected field condition can involve engineering judgment, but general construction activity, supervision, and installation work are generally outside the credit. The design office work is where most construction related claims come from.

We are an engineering firm, not a contractor. Does that change things?

It often makes the picture cleaner, because design is the core of the business. The same contract questions still apply, and time records that separate design work from drafting production and administration make a study much stronger.