Tips for tracking development time

Time records are usually the weakest part of an R and D credit claim, not because the work did not happen, but because nobody wrote it down in a usable way. These habits take minutes a week and give a study something solid to stand on.

1. Track time by project, not just by week

A total hours figure for the week does not show what the hours were spent on. Ask team members to split their time across the projects or products they touched, even in rough blocks. Project level records are what connect a salary to a qualifying activity.

2. Use the tools the team already opens every day

Ticket systems, project boards, calendars, and commit or job logs already record who worked on what and when. A study can often rebuild a reasonable time picture from these existing records, which is far easier than adding a new timesheet nobody will keep up.

3. Round honestly and leave gaps where they belong

Records that show every developer at one hundred percent development time, every week, with no meetings, support work, or holidays, do not look real. Honest records with normal gaps are more believable and usually still support a meaningful claim.

4. Write down the non qualifying time too

Support tickets, routine maintenance, sales calls, and training are part of a normal week. Noting them as they happen protects the claim, because it shows the split was considered rather than assumed.

5. Do a short monthly review while memories are fresh

Fifteen minutes a month to check that project time looks roughly right is far easier than reconstructing a year in January. The person doing the review should be someone who actually knows what the team worked on.

6. Keep one named owner for time records

When everyone assumes someone else is keeping track, nobody does. Name one person, often an operations manager or team lead, who checks that time is being recorded and chases gaps.

7. Save the raw exports, not just summaries

Keep the underlying ticket exports, calendar data, and payroll reports for each tax year in one folder. Summaries can be rebuilt from raw records, but raw records cannot be rebuilt from a summary.

8. Separate experimenting from routine work in the notes

A short note on a ticket, such as tried a new approach because the standard one failed testing, is gold for a study. It shows the uncertainty and the trial that the tax rules look for, in the team's own words.

A direct answer: you do not need stopwatch level records. You need consistent, project level records made close to when the work happened, backed by the everyday systems your team already uses.

Related: the documentation checklist and tips for documenting projects all year.

Request a free qualification check